🔧 What to Expect During Your Solar Installation

Table of Contents

A Step-by-Step Guide from Site Survey to Flip-the-Switch

Going solar is an exciting step toward energy independence — but we understand that it can feel a bit overwhelming at first. At Aicon Solar, we believe the process should be transparent, stress-free, and tailored to your home.

Here’s exactly what to expect during your solar installation — from the moment you sign up to the day your system starts producing clean energy.

1️⃣ Free Consultation & Custom Proposal

Everything starts with a quick phone call or in-home visit. We’ll review:

  • Your roof and available space
  • Past energy usage (electric bills)
  • Your goals (bill savings, backup power, or both)
  • Budget and financing options

We then prepare a custom solar design, projected savings, and system size recommendation — all at no cost.

2️⃣ Site Survey & Engineering

Once you’re ready to move forward, our team schedules a site survey to gather technical data:

  • Roof structure and measurements
  • Main electrical panel inspection
  • Shading analysis
  • Access for installation

This info is passed to our engineering and permitting team, who finalize the system layout and electrical plans.

3️⃣ Permitting & Utility Approval

We handle all paperwork with your:

  • City or county building department
  • Homeowners association (if needed)
  • Utility provider (for interconnection approval)

📌 Permitting can take 2–4 weeks, depending on the city and utility.

4️⃣ Installation Day

Our licensed crew arrives ready to install your full system — typically in 1 to 2 days, depending on complexity.

What to expect:

  • Mounting rails secured to roof rafters
  • Panels safely installed and wired
  • Inverter(s), batteries, or EV chargers installed if applicable
  • All work inspected and cleaned before we leave

We’ll also walk you through the system and answer any final questions.

5️⃣ Final Inspection

After installation, we schedule a final inspection with your city or county. A certified inspector will check the system for safety and code compliance.

Once approved, we move to the final step…

6️⃣ Utility Connection & Permission to Operate (PTO)

We submit the final paperwork to your utility (like SDG&E or SCE) for interconnection approval. Once granted, you’ll receive official Permission to Operate (PTO) — and we’ll flip the switch!

🏁 After Activation

  • You’ll start seeing your energy bill drop within the next 30–60 days
  • You’ll have access to a mobile app (like Tesla or Enphase) to monitor performance
  • We’ll stay available for support, warranty service, and future upgrades (like batteries or EV charging)

👍 Why Homeowners Choose Aicon Solar

  • Family-owned, local, and experienced
  • Seamless project management from start to finish
  • Honest, no-pressure consultations
  • Premium equipment and workmanship warranties

⚡ Ready to Get Started?

Your solar journey starts with a quick call or online quote.
📞 Contact us for a free consultation
📩 Or request a personalized solar savings report